Waller County Septic
Get a free quote

Home › Waller County septic permit guide

How to get a septic permit in Waller County, TX

Waller County Environmental is the permitting authority for septic systems (on-site sewage facilities, or OSSFs) in unincorporated Waller County. This is the order the steps happen in.

Get a free quote
Parallel septic drainfield trenches with white perforated pipe laid on washed gravel in dark soil on a rural property

Before you start: is it Waller County?

Confirm your property is in unincorporated Waller County. Some addresses near Waller and Hockley are in Harris County, and properties inside a city or a utility district may have sewer available. Look up your Property ID (the "R number") on the Waller County Appraisal District site; the application asks for it.

Step 1: Floodplain development permit or exemption

Waller County Road & Bridge issues this first. The county's homeowner guide states you cannot get a septic permit without it. If the property is in the floodplain, the septic application will also ask for an approved elevation certificate.

Step 2: Site evaluation

A TCEQ-licensed site evaluator or a professional engineer evaluates the lot (30 TAC §285.30): two soil borings or backhoe pits at opposite ends of the proposed disposal area, soil and restrictive-layer analysis, a check for groundwater within 24 inches of the excavation bottom, slopes and drainage, the 100-year floodplain, and required separation distances.

Step 3: System design

An engineer or registered sanitarian designs the system from the site evaluation, the home's living square footage, and the bedroom count. Waller County's guide notes that a room with a closet counts as a bedroom.

Step 4: Apply

Apply online through MGO Connect: choose Texas – Waller County, then "On-Site Sewage Facility – Residential" (or Commercial). The county's residential packet lists these items:

  1. Completed application
  2. Design / planning materials / site evaluation
  3. Floor plan
  4. Well log (or proof of public water supply)
  5. Aerobic systems only: an Affidavit to the Public, recorded in the County Clerk's office before you submit
  6. Aerobic systems only: a two-year maintenance contract
  7. Permit fee (the packet lists $310 for a single-family dwelling; confirm the current fee)

Step 5: Installation and inspection

A TCEQ-licensed installer builds the system to the approved design, and the county inspects it before it is covered and approved.

After approval: aerobic maintenance

Aerobic systems must be under a maintenance contract for the first two years, with a licensed maintenance provider inspecting and reporting to the county at least every four months (every six months with qualifying electronic monitoring). After two years, a single-family owner must renew the contract within 30 days or, where allowed, maintain the system personally.

Sources

General information, not legal advice. Requirements and fees change; confirm with Waller County Environmental.

Get a free septic installation quote

Tell us about the property and the project. Independent local septic installers will contact you with a quote.

Your contact info

Free, no obligation. We never sell your information to marketers. See our privacy policy.

Get a free quote