Before you start: is it Waller County?
Confirm your property is in unincorporated Waller County. Some addresses near Waller and Hockley are in Harris County, and properties inside a city or a utility district may have sewer available. Look up your Property ID (the "R number") on the Waller County Appraisal District site; the application asks for it.
Step 1: Floodplain development permit or exemption
Waller County Road & Bridge issues this first. The county's homeowner guide states you cannot get a septic permit without it. If the property is in the floodplain, the septic application will also ask for an approved elevation certificate.
Step 2: Site evaluation
A TCEQ-licensed site evaluator or a professional engineer evaluates the lot (30 TAC §285.30): two soil borings or backhoe pits at opposite ends of the proposed disposal area, soil and restrictive-layer analysis, a check for groundwater within 24 inches of the excavation bottom, slopes and drainage, the 100-year floodplain, and required separation distances.
Step 3: System design
An engineer or registered sanitarian designs the system from the site evaluation, the home's living square footage, and the bedroom count. Waller County's guide notes that a room with a closet counts as a bedroom.
Step 4: Apply
Apply online through MGO Connect: choose Texas – Waller County, then "On-Site Sewage Facility – Residential" (or Commercial). The county's residential packet lists these items:
- Completed application
- Design / planning materials / site evaluation
- Floor plan
- Well log (or proof of public water supply)
- Aerobic systems only: an Affidavit to the Public, recorded in the County Clerk's office before you submit
- Aerobic systems only: a two-year maintenance contract
- Permit fee (the packet lists $310 for a single-family dwelling; confirm the current fee)
Step 5: Installation and inspection
A TCEQ-licensed installer builds the system to the approved design, and the county inspects it before it is covered and approved.
After approval: aerobic maintenance
Aerobic systems must be under a maintenance contract for the first two years, with a licensed maintenance provider inspecting and reporting to the county at least every four months (every six months with qualifying electronic monitoring). After two years, a single-family owner must renew the contract within 30 days or, where allowed, maintain the system personally.
Sources
- Waller County, Environment page (MGO Connect application steps)
- Waller County residential OSSF application packet
- Waller County "Septic 101 – Aerobic Septic System" guide
- 30 Texas Administrative Code §285.30, Site Evaluation
- TCEQ, Maintenance of On-Site Sewage Facilities
General information, not legal advice. Requirements and fees change; confirm with Waller County Environmental.
Get a free septic installation quote
Tell us about the property and the project. Independent local septic installers will contact you with a quote.
